The changes aren't as obvious at this stage of the reno but we're making tons of progress. We've finalized our kitchen layout, we've decided to add a 2 piece bathroom on the main floor and the master bedroom is now going to be on the main floor. In total this house will have 2-4 piece bathrooms, 1-3 piece bathroom and 1-2 piece bathroom and in the end it will be worth it. Check out the pictures below to see the changes.
The main bathroom is gutted
The entire basement is gutted
Doesn't look quite the same
The wall between the living room and kitchen is gone